摘要 |
<p>A method comprising placing elements in a layout, performing clock tree synthesis, and performing routing. The method further comprising, in parallel with one of the clock tree synthesis or the routing, performing a footprint based optimization, substituting a footprint equivalent element in a path based on a timing slack of the path.</p> |