摘要 |
<p>The method involves arranging a covering layer (9) in water permeable support layers (2, 8), and applying asphalt layers at a processing temperature for forming the support layers. Cooling pipes (3) are inserted into the asphalt layers, and the covering layer is applied on the support layers after hardening the asphalt layers. Coolant permanently flows through the cooling pipes at preset pressure and flow speed for producing defined heat transmission between the asphalt layers and the cooling pipes when the cooling pipes are inserted into the asphalt layers and made of plastic. An independent claim is also included for a sports flooring comprising a covering layer arranged in water permeable support layers.</p> |