发明名称 OPERATION CONTROL SYSTEM AND OPERATION CONTROL METHOD FOR PASSENGER CONVEYOR
摘要 <p>HE-1221-SG[Problem] To detect the existence of a portion from which a step has been removed immediately after a start-up instruction is given to a passenger conveyor so that safety of passengers and workers can be secured before the passenger conveyor is operated at a rated velocity[Solution] An operation control system for an escalator (passenger conveyor) E which includes steps I linked to one another endlessly and travels between upper and lower boarding areas la and lb diagnoses existence of an opening portion caused by a missing one of the steps 1 of the escalator E and controls the travelling of the escalator E based on a result of the diagnosis. The system includes a starting torque calculating portion 8 which calculates driving torque with which the escalator E starts up, and an opening existence diagnosing portion which diagnoses the existence of the opening portion caused by the step, based on a value of the driving torque with which the escalator E starts up and conditions of an operation direction of the escalator E. When the existence of the opening portion is diagnosed, an information unit provides information about the current position of the opening portion. [Selected Drawing] Fig. 2</p>
申请公布号 SG195447(A1) 申请公布日期 2013.12.30
申请号 SG20130027289 申请日期 2013.04.11
申请人 HITACHI BUILDING SYSTEMS CO., LTD. 发明人 YOSHIHARU IGARASHI;TERUYOSHI ATSUSAWA;YOSHIKI SAKATA
分类号 主分类号
代理机构 代理人
主权项
地址