发明名称 Method and arrangement for controlling an operation of an electric energy production facility during a disconnection to a utility grid.
摘要 It is described a method for operating an electric energy production facility (100) comprising at least one wind turbine (101, 102, 103, 104), in particular during a fault in a utility grid (109) to which energy is to be delivered, the method comprising: disconnecting the utility grid (109) from the wind turbine (101, 102, 103, 104); connecting an external generator (166) via a cable (111,112,113,114) to an auxiliary equipment (171,172,173,174) of the wind turbine, to deliver active power (P) to the auxiliary equipment, wherein the cable is connected to a converter (141,142,143,144) of the wind turbine the converter supporting reactive power (Q). Further a corresponding arrangement is described.
申请公布号 EP2503146(B1) 申请公布日期 2013.12.18
申请号 EP20110158992 申请日期 2011.03.21
申请人 SIEMENS AKTIENGESELLSCHAFT 发明人 BECH, JOHN;MADSEN, KNUD DAM HAGEMAN
分类号 H02J3/18;F03D9/00;H02J3/38;H02J9/04;H02K7/18 主分类号 H02J3/18
代理机构 代理人
主权项
地址