发明名称 PRODUCTION MANAGEMENT METHOD AND PRODUCTION MANAGEMENT SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a production management method and production management system capable of quickly reducing intermediate work in process even in the case that a time required for inspection extends over a long time.SOLUTION: A production management system 1 for executing a bacteriological inspection on a lump of meat 2 subdivided to a subdivision pack 20 with an alternate inspection 10a1 using a microorganism inspection device 12, and a culture inspection 10a2 for culturing bacterium has a control device 3 for giving an individually identifiable identification code 20a to the subdivision pack 20. The control device 3 allows the lump of meat 2 to be proceeded to a production part 10b on the basis of a first inspection result of the alternate inspection 10a1 having a short inspection time, and also enables the identification code 20a attached to the subdivision pack 20 obtained by subdividing the lump of meat 2 to be selected when a second inspection result of the culture inspection 10a2 having a long inspection time does not satisfy prescribed reference, which is made to be a production management method in the production management system 1.
申请公布号 JP2013250951(A) 申请公布日期 2013.12.12
申请号 JP20120127425 申请日期 2012.06.04
申请人 HITACHI POWER SOLUTIONS CO LTD 发明人 IZUMITANI HISANORI;ANDO TAKASHI;WATANABE YUSUKE
分类号 G05B19/418;G06Q50/04 主分类号 G05B19/418
代理机构 代理人
主权项
地址