摘要 |
A technique facilitates preparation of a tubing string, such as a tubing string located in a well. For example, a ball seat member may be mounted in a tubular of a tubing string. A system is coupled to the ball seat member to enable rotation of the ball seat member between cycles. Additionally, a cycle control system is employed in cooperation with the system coupled to the ball seat member to provide control over the number of cycles. Multiple tubing integrity tests may be performed while the system ball seat member is run in hole. Additionally, the system may be used to set a hydraulic packer. |