发明名称 METHOD AND SYSTEM FOR CONSTRUCTING A MATERIAL INFORMATION IN THE SHIP
摘要 The present invention relates to a method and a system for constructing actual material amount information of an actual material ship which enables a user to perform purchase, manufacturing and installation of materials, or to use material information in constructing a new ship, or to use the material information in comparison/analysis with planning material amount or actual material amount of the other ship, by databasing the material amount information in an ERP database into manufacturing - bill of material (M-BOM) structure on a product lifecycle management (PLM) system, and then databasing the material amount information into S-BOM structure and P-BOM structure. The system for constructing material amount information in a ship according to the present invention includes: the ERP database in which actual material amount information of a ship or actual material ship information is stored; the PLM system managing to refer to or search the actual material amount information or the actual material ship information in the database type; and a material amount information constructing apparatus which brings the actual material amount information in the type of standard material ship from the ERP database and generates M-BOM structure of a loading unit block, and then generates the actual material amount information of the M-BOM structure into system-BOM (S-BOM) structure, and generates P-BOM structure to make pre material amount plan for a new ship and to use the pre material amount plan, and then stores the actual material amount information in the ERP database so that the user can use the actual material amount information and the actual material amount ship information. [Reference numerals] (AA) START;(BB) END;(S210) Bring actual material amount information from ERP database on PLM system according to standard material ship management type;(S220) Generate actual material amount information into M-BOM structure of loading unit block;(S230) Generate actual material amount information of M-BOM structure as S-BOM structure;(S240) Generate as P-BOM structure to make and to utilize pre material amount plan for new ship;(S250) Store M-BOM structure, S-BOM structure and P-BOM structure in ERP DB
申请公布号 KR20130134589(A) 申请公布日期 2013.12.10
申请号 KR20120058204 申请日期 2012.05.31
申请人 HYUNDAI HEAVY INDUSTRIES CO., LTD. 发明人 KIM, DONG WOO
分类号 G06Q10/06;G06Q10/10 主分类号 G06Q10/06
代理机构 代理人
主权项
地址