发明名称 REINFORCING METHOD FOR PROXIMITY MOUNTAIN TUNNEL
摘要 PROBLEM TO BE SOLVED: To provide a reinforcing method for a proximity mountain tunnel which can: secure stability of ground at a pillar section in a pilot tunnel by reinforcing the same with a structure which is easily installed or removed; and reduce a construction period and a construction cost.SOLUTION: A reinforcing method for a proximity mountain tunnel reinforces a first tunnel 1A when excavating mountain tunnels comprising the first tunnel 1A and a second tunnel 1B juxtaposed to each other. After excavating the first tunnel 1A, the reinforcing method of the proximity mountain tunnel: leans a plurality of steel material 21 against a tunnel side face along a forward direction of the tunnel with a distance from a side wall surface of a pillar section 1P; creates a wall body section 20 by closing spaces between neighboring steel materials 21 with partition plates 22; and fills a space between the wall body section 20 and the side wall surface of the pillar section 1P with fluidized soil 23.
申请公布号 JP2013245533(A) 申请公布日期 2013.12.09
申请号 JP20120122041 申请日期 2012.05.29
申请人 SHIMIZU CORP 发明人 YABE YUKIO
分类号 E21D11/10 主分类号 E21D11/10
代理机构 代理人
主权项
地址