摘要 |
PROBLEM TO BE SOLVED: To provide a plant configured to minimize an amount of wet steam supplied to downstream steam turbines while minimizing reheat equipment requirements.SOLUTION: A steam Rankine cycle plant 10 includes: a higher-pressure steam turbine 20 having an outlet 22 for exhausting exhaust steam; a reheater 35 fluidly connected to the higher-pressure steam turbine 20; a lower-pressure steam turbine 25 having an inlet 27 fluidly connected to the reheater 35; and a bypass fluidly connected to the outlet 22 and the inlet 27 to bypass the reheater. The higher-pressure steam turbine 20 has an intermediate stage. The reheater 35 is fluidly connected to the intermediate stage, allows extraction steam to be extracted from the intermediate stage, and directs the extraction steam to the reheater 35. |