摘要 |
In a segment tunnel formation, which a shield tunnel method is applied to, a construction according to a steel wire supply, stretch, and cut is shortened by extending a steel wire or a strand by inserting the steel wire or the strand for assembling each segment. Moreover, provided are a steel wire connecting apparatus and a method for a segment assembly of a shield tunnel which shorten a construction period by extending a steel wire or a strand by inserting the steel wire or the strand in comparison with an existing bolt fastened method in which many bolts are used per each segment. |