The method for reinforcement of wall footing with reinforced-concrete brickwork includes increase of the area of the basement, at that outside the old basement armature is installed, with concreting the lower section of the new basement, and after strengthening screw joints of the new basement are arranged, the upper mark of that one is arranged higher than the upper mark of the old basement, and at that height horizontal steel elements of the new support are fixed on the additionally arranged basements. Between the steel elements of the old and the new support inclined knees are mounted, those are tightened to each other with screw joints in two levels till formation of needed pre-stress, with following additional lining. |