摘要 |
In order to test a power engineering test object (14), a test signal is generated by a first test device (2), which is supplied by the first test device (2) to a second test device (3) to be amplified by the same and to be output to the power engineering test object (14). Further, the test signal may be applied by the first test device (2) to the power engineering test object (14), the test signal preferably being time-synchronously output by the first test device (2) and the second test device (3) to the power engineering test object (14). |