摘要 |
A scheduling method includes acquiring first information, second information, and third information from a first terminal located in a service area of a first base station; determining based on the first information, the second information, and the third information, whether a first process assigned to the first terminal is to be collected; and assigning the first process to a second terminal located in the service area of the first base station, when at the determining the first process is determined to be collected.
|