发明名称 METHOD CONSTRUCTING THE SHIELD TUNNEL USING SEGMENTS WITH THE PRESTRESSED STRAND CABLES OF A LONGITUDINAL DIRECTION AND THE SHEAR KEYS OF A HORIZONTAL DIRECTION
摘要 The present invention is provided to arrange each segment in which two center pipe passages and two end pipe passages are formed in a longitudinal direction adjacent to each other in row order. A strand is inserted, tensed up, and mounted into, as a unit, longitudinal segments in four rows. Only one strand is mounted on each segment and thus the segments are mounted and fixed. The rest of three strands passed through a pipe passage and then the segment which is located in other row is sequentially mounted and fixed in the above manner. Therefore, a segment base reaction wall through which four strands pass is formed, and the segments in other row are easily and sequentially mounted and fixed by the rest of three strands based on the base reaction wall which is structurally stabilized. The segment base reaction wall is formed and the fixation and mount are sequentially performed by the above repetitive process along with digging, such that the segments are efficiently and economically assembled. [Reference numerals] (AA) Tunnel progressing direction;(BB) 1 line;(CC) 2 line;(DD) 3 line;(EE) 4 line;(FF) 5 line;(GG) 6 line;(HH) 7 line
申请公布号 KR20130124262(A) 申请公布日期 2013.11.13
申请号 KR20130124864 申请日期 2013.10.18
申请人 KOREA INSTITUTE OF CONSTRUCTION TECHNOLOGY;CMER CO., LTD. 发明人 MA, SANG JOON;KIM, DONG MIN
分类号 E21D11/08;E21D9/06 主分类号 E21D11/08
代理机构 代理人
主权项
地址