发明名称 |
SOIL IMPROVEMENT BODY, SOIL IMPROVEMENT STRUCTURE, AND FOUNDATION CONSTRUCTION METHOD |
摘要 |
PROBLEM TO BE SOLVED: To provide a soil improvement body capable of inexpensively suppressing ground deformation effectively against a force from the outside, a soil improvement structure, and a foundation construction method using the soil improvement body.SOLUTION: A soil improvement material is mixed into excavated ground and agitated; a first wall body 21 elongated in one direction in a plan view is provided; and a second wall body 22 connected to an outer hull of the first wall body 21 and elongated in a direction of crossing the one direction is provided. Thereby, a soil improvement body 20 is formed. The soil improvement body can also be configured by providing the second wall body 22 in a direction orthogonal to the one direction. |
申请公布号 |
JP2013227747(A) |
申请公布日期 |
2013.11.07 |
申请号 |
JP20120099174 |
申请日期 |
2012.04.24 |
申请人 |
RE EARTH CORP |
发明人 |
TAKEDA SHINICHI;MEGURO KAZUNORI |
分类号 |
E02D3/12;E02D5/46;E02D27/12;E02D27/34 |
主分类号 |
E02D3/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|