摘要 |
A cyclic remediation process to restore oil recovery from a primary oil production well that has watered off from bottom water encroachment (cone or crest) whereby: (a) the primary oil production well has a produced water cut in excess of 95% (v/v); (b) the oil is heavy oil, with in-situ viscosity >1000 cp; wherein said process includes: (c) injecting a steam slug with a volume of 0.5 to 5.0 times the cumulative primary oil production, with steam volumes measured as water volumes; (d) shutting in the well for a soak period, after the steam injection is complete; and (e) producing the well until the water cut exceeds 95%.
|