摘要 |
THE PRESENT APPLICATION DESCRIBES A METHOD AND SYSTEM ASSOCIATED WITH THE PRODUCTION OF HYDROCARBONS. IN THE METHOD, FLUID TRAVEL TIME MODELS (1200) ARE CONSTRUCTED FROM A RESERVOIR MODEL (312, 1600). THEN, RESERVOIR CONNECTIVITY MEASURES ARE CALCULATED (110) FROM THE FLUID TRAVEL TIME MODELS (1200) AND ANALYZED TO DETERMINE A LOCATION FOR AT LEAST ONE WELLS (602, 612, 902, 912, 1202, 1502, 1504, 1602, 1604). BASED ON THE ANALYSIS, ONE OR MORE WELLS MAY BE DRILLED AND HYDROCARBONS PRODUCED (112). |