摘要 |
PURPOSE: An installation method of wind power generator, and an apparatus thereof are provided to mutually couple a tower structure so that the tower structure is supported by stably lifting a double temporary frame and a lifting means which is provided on the temporary frame. CONSTITUTION: An installation method of wind power generator includes a base structure (200), a connection deck (300), a temporary frame (400), and a lifting means (500). The connection deck is provided on the top of the base structure so as to move the tower structure (110) to the top of the base structure from a barge, a ship, or a vehicle in which the tower structure is loaded. The temporary frame is vertically stood on the top of the connection deck by forming so that the tower structure is temporary fixed in the temporary frame. The lifting means is provided on the top area of the temporary frame by forming so as to move the tower structure by raise the tower structure upward and lower the tower structure again. |