PURPOSE: An installation method of a cone structure in a top side deck is provided to weld a heavy cone structure to a top side deck using a stair tower without an additional scaffold. CONSTITUTION: An installation method of a cone structure in a top side deck is as follows. A top side deck (100) is built on the ground. An existing cone structure installed on a deck support unit (120) is removed. The top side deck is lifted up by installing a jacking column using the position where the existing cone structure is removed as a jacking point. A deck support device (200) is installed on the bottom surface of the top side deck, and a cone structure (110) is installed on a stair tower (600). The stair tower is moved to a position below the installation position of the cone structure. The cone structure is attached to the deck support unit. |
申请公布号 |
KR20130117171(A) |
申请公布日期 |
2013.10.25 |
申请号 |
KR20120040052 |
申请日期 |
2012.04.18 |
申请人 |
HYUNDAI HEAVY INDUSTRIES CO., LTD. |
发明人 |
KIM, HYEON CHEAL;SHIM, SONG SEOB;KIM, HAE WON;KUM, YOUN JO |
分类号 |
B63B9/06;B63B35/44;E02B17/00 |
主分类号 |
B63B9/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|