摘要 |
A thermal stress reduction method includes ramping an electric power generator, 240, to start an aircraft engine, 280, for a time period associated with the aircraft engine start sequence toggling three-level inverter switch array, 300, to a three-level pulse width modulation mode, determining if a first time interval in the three-level pulse width modulation mode exceeded a predetermined three-level pulse width modulation mode interval, in response to the first time interval exceeding the three-level pulse width modulation mode interval, toggling the three-level inverter switch array to a two-level pulse width modulation mode, determining if a second time interval in the two-level pulse width modulation mode exceeded a predetermined two-level pulse width modulation mode interval and in response to the second time interval exceeding the two-level pulse width modulation mode interval, toggling the three-level inverter switch array to the three-level pulse width modulation mode. |