发明名称 DEVELOPMENT METHOD OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN
摘要 FIELD: oil and gas industry.SUBSTANCE: method involves drilling of injection and production horizontal wells with location of a working face of an injection well above the middle part of horizontal production well, pumping of heat carrier through injection wells, extraction of product through production horizontal wells with monitoring of the product temperature. When allowable temperature is exceeded, a packer is installed and then transferred in a production well for extraction in a section of horizontal shaft with lower temperature. An injection well is drilled above a production well in its direction. Injection well is equipped with additional portable blind packer, which is transferred in horizontal section from well head to working face parallel to packer of production well, which is installed after break of heat carrier from injection well to production well with creation of hydrodynamic communication between those wells for cutout of heat carrier break section. At further break of heat carrier from injection well to production well above the installed packer, it is reinstalled in series above heat carrier break sections.EFFECT: increasing oil recovery of a formation, increasing the coverage range of the formation with an agent influencing due to enlarging the formation warm-up zone.1 dwg
申请公布号 RU2496000(C1) 申请公布日期 2013.10.20
申请号 RU20120114537 申请日期 2012.04.12
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IMENI V.D. SHASHINA 发明人 KHISAMOV RAIS SALIKHOVICH;BAKIROV IL'SHAT MUKHAMETOVICH;IDIJATULLINA ZARINA SALAVATOVNA;ARZAMASTSEV ALEKSANDR IVANOVICH;OSNOS LILIJA RAFAGATOVNA;FEDOROV ALEKSANDR VLADISLAVOVICH
分类号 E21B43/24 主分类号 E21B43/24
代理机构 代理人
主权项
地址
您可能感兴趣的专利