摘要 |
PURPOSE: A frame structure of a tent house is provided to enhance work efficiency and to prevent the frame from being bent as increasing the intensity of the frame. CONSTITUTION: Top chord pipes (110) are installed in the upper side of a frame (10). Lower chord pipes (120) are separately installed in the lower side of the top chord pipes with a predetermined interval. A plurality of perpendicular reinforced supporting bars (130) and inclined reinforced supporting bars (140) connect and combine the top and lower chord pipes. Both ends of a plurality of connection fixing bars are respectively combined in each frame of the tent house. A plurality of perpendicular connection parts (300) support and fix the frames which are overlapped with lower side and ground. A pair of perpendicular bars (301) is perpendicularly set from the ground. A plurality of horizontal bars (302) is combined with ground in parallel between the pair of perpendicular bars. A plurality of inclined bars (303) is diagonally combined between horizontal bars. |