PURPOSE: A debris barrier including a plurality of hollow type structures is provided to include simple maintenance and excellent workability and reduce fluidity by absorbing moisture in an avalanche of earth and rocks with a penetration hole. CONSTITUTION: A plurality of hollow type structures (100) of a debris barrier is installed at predetermined intervals. The hollow type structure includes a main body (110) in which a hollow is formed and a penetration hole formed in the main body. The main body is fixed to the ground by a fixing unit in order to block an avalanche of earth and rocks and reduce energy. The penetration hole is formed on the upper surface of the main body and four side surfaces, and a net member is installed. The fixing unit includes a connection member (121), a fixing member (122), a main body connecting member (123), and a fixing and connecting member (124).
申请公布号
KR101313868(B1)
申请公布日期
2013.10.01
申请号
KR20120134648
申请日期
2012.11.26
申请人
GANGNEUNG-WONJU NATIONAL UNIVERSITY INDUSTRY ACADEMY COOPERATION GROUP
发明人
YUN, CHAN YOUNG;HAN, KWANG DOO;LEE, SANG DON;KIM, WOON HYUNG;YEO, IN SEOK;KIM, SUNG TAE;MOON, KANG KOOK