摘要 |
PROBLEM TO BE SOLVED: To provide a bridge having FRP members suitably joined.SOLUTION: A bridge 1 includes two beams 9 disposed in series and constituting a main girder 3, a joint plate 15 disposed across the two beams 9, and bolts 17 and nuts 19 connecting between the joint plate 15 and the two beams. The two beams 9 and the joint plate 15 are composed of FRP, and at least the surfaces of the bolts 17 and nuts 19 are composed of FRP or resin. |