摘要 |
Methods and systems are provided for generating a development plan for a hydrocarbon asset. A high-fidelity computer model of a hydrocarbon asset is created. A low-fidelity computer model of the hydrocarbon asset is created. The low-fidelity computer model is iterated on to an interim solution. A comparison is generated of the interim solution to a solution obtained from a simulation of the high-fidelity computer model at the variables of the interim solution. The low-fidelity computer model is calibrated based, at least in part, on the comparison. The development plan for the hydrocarbon asset is generated based, at least in part, on a result from the calibrated low-fidelity computer model. The low-fidelity computer model is a mixed-integer nonlinear programming problem with complementarity.
|