A method of controlling the operation of an electrostatic precipitator (6), wherein a soot-blowing operation is performed in an upstream device (2), comprising the steps of. causing a signal to be sent to the effect that a soot-blowing operation is about to be initiated in said upstream device (2) to a controller (34) that is operative for controlling the performance of a rapping event with respect to the electrostatic precipitator (6), and said controller (34) causing a rapping decision (52; 152) to be made, based on the receipt thereby of said signal, said rapping decision including the establishment of a first point in time (T1) for initiating the performance of a rapping event with respect to the electrostatic precipitator (6), such that said first point in time (T1) is correlated to a second point in time (T2), the latter being the time at which the soot-blowing operation of said upstream device (2) is initiated.
|