摘要 |
A method for building and renovating golf course sand bunkers to improve infiltration of water through a drainage system reduces the chance of contamination of the sand and to reduce erosion and maintenance and provide consistent playable sand for golf. The bunker is built to slopes based on the sand selected for use. A drainage system and a layer of fine pea gravel is installed over the entire floor of the bunker. A pre-polymer is sprayed onto the layer of pea gravel to secure it in place. The polymer sprayed bunker is permitted to cure for approximately 24 hours. A sufficient amount of bunker sand is added and compacted so the entire bunker is covered. Washed sod is placed around the bunker to stabilize the edge of the bunker.
|