发明名称 CONSTRUCTION METHOD OF GRASS PLANTING BREAST WALL FOR SOFT-GROUND USING GROWN-UP ALL-SEASON SOD
摘要 <p>PURPOSE: A construction method of a greening retaining wall for poor ground using grown turf for all seasons is provided to construct facilities without increase of construction costs by constructing the facilities on the poor ground in the same condition as a mounding unit without basic treatment facilities. CONSTITUTION: A construction method of a greening retaining wall for poor ground using grown turf for all seasons comprises as follows. A foundation ground is arranged (S100), and an installation panel is stood up on the arranged ground (S110). A plurality of installation panels which is adjacent to each other is arranged side by side by an arrangement rod (S120). A fixing net is installed so that at least a part of the fixing net is located on the rear surface of the installation panel (S130), and turf is mounted on the rear surface of the installation panel (S140). A moisture protecting mat is installed on the rear of the turf for four seasons (S150), and a reinforcing material is installed on the rear of the turf (S160). A mounding unit is formed by filling in and compacting the reinforcing material on the rear of the turf and the installation panel. One end of the fixing net is fixed by being moved to the upper part of the mounding unit which is filled in (180), and the installation panel is removed (190). [Reference numerals] (AA) Start; (BB) End; (S100) Step of arranging a foundation ground; (S110) Step of standing an installation panel up on the arranged ground; (S120) Step of arranging a plurality of installation panels adjacent to each other; (S130) Step of installing a fixing net so that at least a part of the fixing net is located on the rear surface of the installation panel; (S140) Step of mounting four season turf on the rear surface of the installation panels; (S150) Step of installing a moisture protecting mat on the rear of the four season turf; (S160) Step of installing a reinforcing material on the rear surface of the turf; (S170) Step of forming a mounding unit by filling in and compacting the reinforcing material on the rear surface of the installation panels and the four season turf; (S180) Step of fixing one end of the fixing net by moving the one end of the fixing net to the upper part of the mounding unit; (S190) Step of removing the installation panels</p>
申请公布号 KR101301950(B1) 申请公布日期 2013.09.10
申请号 KR20120144359 申请日期 2012.12.12
申请人 RSGREEN LTD. 发明人 KANG, SUK JO
分类号 E02D29/02;A01G1/00;E02B3/14;E02D17/20 主分类号 E02D29/02
代理机构 代理人
主权项
地址