摘要 |
PROBLEM TO BE SOLVED: To reduce an installation space for an air insulation switchgear.SOLUTION: An air insulation switchgear includes first to third opening/closing apparatuses and a support member. The first opening/closing apparatus is connected to a first connection bus. The second and third opening/closing apparatuses are connected to second and third connection buses which adjoin the first connection bus at intervals. Those opening/closing apparatuses and connection buses are supported such that an installation height of exposed charging parts of the second and third opening/closing apparatuses and second and third connection buses are made different from an installation height of an exposed charging part of the first opening/closing apparatus and the first connection bus. |