发明名称 |
Manufacturing system for production of prefabricated components e.g. door of passenger car, has manufacturing cell with processing stations whose cycle time is adjusted or aligned to synchronize with basic cycle time of production unit |
摘要 |
<p>The system (1) has processed base (51-57) for prefabricated components (2) is formed. A manufacturing cell (6) is provided with several processing stations (4a-4g) e.g. welding stations. A production unit (3) is adapted to a base portion (5) in shaping process, to establish basic cycle time (G). The cycle time (B) of processing stations arranged in the manufacturing cell is adjusted or aligned to synchronize with basic cycle time of the production unit. The processing stations of manufacturing cell are arranged in tandem production line (7). An independent claim is included for a method for manufacturing prefabricated components.</p> |
申请公布号 |
DE102012003759(A1) |
申请公布日期 |
2013.08.29 |
申请号 |
DE20121003759 |
申请日期 |
2012.02.24 |
申请人 |
GM GLOBAL TECHNOLOGY OPERATIONS LLC (N. D. GESETZEN DES STAATES DELAWARE) |
发明人 |
KOCH, NIELS;HILBERT, GERHARD |
分类号 |
B23P21/00;B21D43/05;B23Q41/02;G05B19/418 |
主分类号 |
B23P21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|