摘要 |
Detecting and correcting unintended fluid flow between subterranean zones. At least some of the illustrative embodiments are methods that include: injecting a first fluid into a subterranean zone, the injecting by way of a first borehole; making a reading indicative of surface deformation; identifying, based on the surface deformation reading, a flow path for a second fluid out of the subterranean zone; drilling a second borehole that intersects the flow path; and placing a sealing compound into the flow path by way of the second borehole, the sealing compound reduces the flow of the second fluid through the flow path.
|