A method for tracking progress of a construction project comprising storing digital representations of construction drawings and storing information about material costs and amounts of labor needed to build each condition assembly in the drawing. Once the construction project begins, the method allows for a user to enter real time information about status of completion of work on each labor cost code for a selected area and the amount of labor and materials used to achieve that. The program then calculates the percentage of progress of work on each labor cost code, determines whether the labor cost code is on a projected budget and presents the results in color coded format on the drawing and/or on the list of labor cost codes.
|