发明名称 |
CONSTRUCTION METHODS OF SAND MAT HAVING MULTI - LAYER STRUCTURE |
摘要 |
PURPOSE: A double layer structure sand mat construction method is provided to secure the stability of entering equipment, to prevent local sinking, and to improve stability against a shear fracture by increasing bearing power. CONSTITUTION: A double layer structure sand mat construction method comprises the following steps. A first geotextile layer is spread on the base ground, and a first sand mat layer is filled up on the first geotextile layer. A second geotextile layer is spread on the first sand mat layer, and a second sand mat layer is filled up on the second sand mat. A synthetic fiber filter is used for at least the lower part of one layer between the sand mat layer and the second sand mat layer. [Reference numerals] (AA) Start; (BB) End; (S100) Step of spreading a first geotextile layer on the base ground; (S200) Step of forming a first sand mat layer on the first geotextile layer; (S300) Step of spreading a second geotextile layer on the fist sand mat layer; (S400) Step of forming a second sand mat layer on the second sand mat |
申请公布号 |
KR20130092000(A) |
申请公布日期 |
2013.08.20 |
申请号 |
KR20120013420 |
申请日期 |
2012.02.09 |
申请人 |
INDUSTRY-ACADEMY COOPERATION CORPS OF SUNCHON NATIONAL UNIVERSITY |
发明人 |
JU, JAE WOO;PARK, JONG BEOM;PARK, HYUN SU |
分类号 |
E02D3/10 |
主分类号 |
E02D3/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|