发明名称 Method for regenerating bi-layered roadway, involves crushing material torn off by scarification obtain milled material, and treating milled material to form base layer for roadway by watering milled material
摘要 <p>The method involves sacrificing a base layer and a superficial coating layer on entire thickness by a grader ripper, and crushing a material torn off by scarification to obtain a milled material having aggregate particles by a crusher, where the crusher comprises a rotor with fixed hammers. The milled material obtained by the crushing is treated to form another base layer for a roadway by watering the milled material using 1 to 5 liters of water on per square meter of surface of roadway.</p>
申请公布号 FR2986541(A1) 申请公布日期 2013.08.09
申请号 FR20120000357 申请日期 2012.02.07
申请人 BTP BOUCHER 发明人 BOUCHER PHILIPPE
分类号 E01C23/06;E01C13/06 主分类号 E01C23/06
代理机构 代理人
主权项
地址