摘要 |
In an embodiment, a functional unit control method includes, using a performance monitoring unit connected to a processor, collecting performance data of a first type of functional unit in an execution stage of the processor for each process running on a time multiplexed computing system running a multitasking operating system. The method further includes determining a utilization level of the first type of functional unit based on the performance data, and comparing the utilization level of the first type of functional unit with a first threshold. The method also includes, when a first condition has been satisfied, power gating at least one of the first type of functional unit in the processor. The method may include dynamically loading a specific needs register for each time quantum that a process runs on the processor.
|