摘要 |
The station has a transfer path (11) comprising a longitudinal part (P1) and a transversal part (P2). A rail (R) of the longitudinal part is connected with two sections (24, 25) in the transversal part to form a double L-shaped part by a loop arranged between loading and unloading platforms (26, 23). The platforms are shifted from one another in the loop by an interval separating the sections in the transversal part such that the loading and unloading of skiers are performed in the interval on a side of the station in a direction perpendicular to a longitudinal axis of a line. |