发明名称 |
EARTH RETAINING WALL CONSTRUCTION METHOD, CAST-IN-PLACE PILE CONSTRUCTION METHOD, EARTH RETAINING WALL, AND CAST-IN-PLACE PILE |
摘要 |
PROBLEM TO BE SOLVED: To provide an inexpensive and convenient method for constructing a cast-in-place pile in a site where a ground water level is high.SOLUTION: At a position equivalent to the outer periphery of a cast-in-place pile 30, a plurality of soil cement columns 11 are constructed so that their lower ends reaches a depth lower than the ground water level and does not reach a depth equivalent to the lower end of the cast-in-place pile 30, a soil cement wall 10 is constructed having the plurality of soil cement columns 11 annularly connected together, and a ground 1 is drilled to form a drilled hole in the state of stabilizer filled in the drilled hole up to the depth equivalent to the lower end of the cast-in-place pile 30 through the inside of the soil cement wall 10. A reinforcement cage is arranged in the drilled hole, and concrete 15 is placed in the drilled hole. |
申请公布号 |
JP2013147933(A) |
申请公布日期 |
2013.08.01 |
申请号 |
JP20130098179 |
申请日期 |
2013.05.08 |
申请人 |
OHBAYASHI CORP;TOKUSHU KOKOHO KEIKAKU KENKYUSHO:KK |
发明人 |
KANEKO TADASHI;SUDO TOSHIMI;YOKOYAMA BANSHI |
分类号 |
E02D5/18;E02D5/38 |
主分类号 |
E02D5/18 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|