摘要 |
PROBLEM TO BE SOLVED: To provide a reinforcing soil wall construction method not only capable of reducing a construction cost by shortening a back distance of a retaining wall but also capable of securing a temporary greening section until plants grow naturally.SOLUTION: A wall surface material 3 is formed in such a manner that a plurality of belt members 5 assuming an approximately belt-like shape are joined at predetermined intervals, and made of a geocell 3 capable of forming a sediment restraining portion 7 for restraining sediment, by making unjoined portions of the belt members 5 separated from each other. A vegetation mat 20 is fixed to the unjoined portions of the plurality of belt members 5 positioned in the front row, in a state in which a front side of the vegetation mat 20 is inclined to be directed upward, and a space 23 surrounded by the belt members 5 and the vegetation mat 20 is formed on the front surface of the geocell 3, and filled with the sediment. |