摘要 |
The disclosure provides a vessel with a double pontoon arrangement joined together with a central bridge creating an offset "H" arrangement. The bridge spans the pontoons and includes a gantry structure on top of which sits a lifting system. Articulated tugs provide accommodation, propulsion, and power to the main part of the installation vessel. Additional lifting devices can be installed within the gantry to provide further lifting capability. At least two stabilizing legs are provided along each pontoon. Once set up onsite, the stabilizing legs can be deployed to the seabed to lift the installation vessel up a short distance to apply load stability during lifting operations. Seabed piles, mast elements, and turbine elements are delivered by barges that are temporarily moored between the pontoons for offloading and installation. Empty barges are relocated, and successive barges bring remaining elements for offloading and installation to complete the wind turbine installation. |