摘要 |
The method of the present invention deploys CEM into the existing perforations to seal them and then using a BHA that isolates a portion of the wellbore to deliver a material that removes the CEM at a predetermined rate so that the BHA can be used to refracture the recently opened perforation. Additional new perforations can be made and fractured during the process. |