摘要 |
PROBLEM TO BE SOLVED: To unitarily manage environment relation measurement, to prevent measurement omission, and to accurately prepare a written report by storing a measurement item, a measurement point and a measurement period, etc., in a factory in a database, causing each pieces of data to be integrated in a support system, and preparing the written report for a local government or the like.SOLUTION: By a database 10 and person-in-charge determination and contact means 22, a person in charge is retrieved and contact is made to the person in charge. Whether or not it is a period to perform measurement is determined by measurement period determination means 23. Then, by measurement data analysis means 24, comparison with past measurement results is made and determination is made for measurement errors. When determined that there is no measurement error, by written report format output means 26, the written report is prepared from the measurement data. |