摘要 |
PROBLEM TO BE SOLVED: To improve efficiency of an inspection construction plan, prevent inspection omission, and easily prepare a written application to be needed corresponding to contents of an inspection construction by storing an inspection part, an inspection period, etc., in a high pressure gas facility in a database and making a support system fetch each data.SOLUTION: The system includes a database 10, inspection cycle determination means 22, inspection content determination means 23, and written application format output means 25. The inspection cycle determination means 22 determines whether or not it is a cycle to perform an inspection. The inspection content determination means 23 makes a comparison with past inspection results and determination for an inspection history. When it is determined that there is no error in inspection contents and the cycle, a construction plan and a schedule are outputted. Further, the written application format output means 25 prepares a written application from the inspection report data and inspection and management support processing is ended. |