摘要 |
PURPOSE: A construction method of an interlayer floating floor structure, using a floor buffer member for discharging moisture and sound is provided to prevent mold on a wall paper and a floor by smoothly discharging the moisture and sound pressure and to reduce interlayer noise. CONSTITUTION: A cut port is formed at one side of the lower part of a concrete wall(10'), and a plurality of discharge pipes(100) for moisture and sound pressure is fixed through the cut port. A wall surface buffer member(200) is attached on the concrete wall between the discharge pipes for moisture and sound pressure. A floor buffer member(300) is installed on a concrete slab and includes a connection groove(310) at all direction edges. An outer passage and a cross passage in which the moisture and the sound pressure are moved are formed by the connection groove. |