摘要 |
<p>PURPOSE: A drawing design schedule management method of a vessel is provided to share a set of schedule information of drawing design work through a network and analyze a process plan workload, thereby performing the drawing design work according to an equal workload. CONSTITUTION: A management server plans a drawing design schedule for each vessel type and checks a schedule of drawing design work for each process. When a progress degree of the drawing design work for each process reaches the planned drawing design schedule, the management server transmits a warning message of the drawing design schedule to a worker terminal. When the progress degree of the drawing design work for each process exceeds the drawing design schedule, the management server writes an excess list and adjusts the schedule of the drawing design work through the network notification of the excess list. [Reference numerals] (AA) Start; (BB) Manage a drawing design schedule; (CC) Schedule check; (DD) Proximity ?; (EE) Excess ?; (FF) Transmit a warning message; (GG) Write an excess list; (HH) Completion ?; (II) Network notification; (JJ) Register in a database; (KK) Schedule adjustment; (LL) Notification to a next worker; (MM) Process next drawing design; (NN) Return</p> |