发明名称 DAILY PRODUCTION SCHEDULING SYSTEM
摘要 PURPOSE: A system for planning daily work in a tire factory is provided to implement a unit, which groups factors for maximizing efficiency, and a unit, which arranges the equipment by considering a past defect and performance history, by a program of a computer, thereby efficiently and accurately planning the daily work. CONSTITUTION: A system opens a file and selectively reads items by copying the entire item. When an initial inputted value is inputted, the system automatically arranges, stores, and displays a car owner quantity according to a production priority which is set by considering a seller, the standard, and the amount of order. When a user clicks the draft planning establishment based on the data stored in a memory, the system establishes an initial plan by executing a program based on an inputted item. [Reference numerals] (AA) Factory area size distribution list; (BB) Equipment designation size list; (CC) Equipment distribution priority parameter; (DD) Minimize curing change time; (EE) Minimize molding change time; (FF) Past defect history; (GG) Pas performance history; (HH) Minimal size drum diameter; (II) Loadable equipment; (JJ) Possible production inch; (KK) Drum diameter; (LL) Write a size score matrix; (MM) Equipment product possibility capacity; (NN) Non-arrangement list; (OO) Equipment assignment; (PP) Planner adjustment
申请公布号 KR20130082688(A) 申请公布日期 2013.07.22
申请号 KR20110134681 申请日期 2011.12.14
申请人 HANKOOK TIRE CO., LTD. 发明人 SHIN, JIN UK;KIM, JAE HEE
分类号 G06Q10/06;B29D30/08 主分类号 G06Q10/06
代理机构 代理人
主权项
地址