发明名称 Decision method for spillway discharge of hydroelectronic power plant at a flood season
摘要 PURPOSE: A decision method for flood gate discharge of a hydroelectric dam at a flood season is provided to prevent a dam operator from making mistakes in advance by automatically and periodically providing information about the variation of an inflow rate, a discharge rate, and a storage rate. CONSTITUTION: A flood control station server(100) provides information about observed rainfall and a water level. A power generation server(200) provides information about an observed hydroelectric dam. A weather center server(300) stores information about weather conditions from a weather satellite(310), a weather radar(320), a numerical weather forecast model and a weather center observation network(330). A data link server(400) periodically collects various flood gate data. A water system operation server(500) processes flood gate weather information by using a plurality of flood gate modules(700) and flood gate weather data. [Reference numerals] (100) Flood control station terminal; (110) Flood control station terminal; (200) Power generation server; (210) Terminal at Korea Hydro % Nuclear Power Co., Ltd; (300) Weather center server; (310) Weather satellite; (320) Weather radar; (330) Weather center ground observation network; (400) Data link server; (500) Water system operation server; (600) Data base; (700) Flood gate module; (800) User terminal
申请公布号 KR101285044(B1) 申请公布日期 2013.07.10
申请号 KR20110022429 申请日期 2011.03.14
申请人 发明人
分类号 E02B7/20;G05D7/00 主分类号 E02B7/20
代理机构 代理人
主权项
地址