发明名称
摘要 <p><P>PROBLEM TO BE SOLVED: To reduce or eliminate the time interval between decarburization stages without improving the moving speed of a scrap crane. <P>SOLUTION: In the method for operating converter equipment 1 where a cold iron source is respectively charged to a dephosphorizing furnace P and a decarburizing furnace C by one scrap chute d hang at one scrap crane 53, the decarburizing furnace C is charged with molten iron subjected to dephosphorizing treatment, and is thereafter charged with a cold iron source. <P>COPYRIGHT: (C)2007,JPO&INPIT</p>
申请公布号 JP5230062(B2) 申请公布日期 2013.07.10
申请号 JP20050226985 申请日期 2005.08.04
申请人 发明人
分类号 C21C5/28;C21C1/02;C21C5/46 主分类号 C21C5/28
代理机构 代理人
主权项
地址