摘要 |
PROBLEM TO BE SOLVED: To prevent an inclined plate or an inclined tube installed in a transverse flow sedimentation basin from being blocked.SOLUTION: In a transverse flow sedimentation basin with an inclined plate and/or an inclined tube installed, sheet films are formed at intervals between the adjacent sheet films upstream of the inclined plate or the inclined tube. |