摘要 |
An electric power management system 1 is comprised of an electric power management device 10, measuring devices 4 and 5, and a database 6. The database 6 has stored system information which specifies, for every electric device, a user entity, a location to supply electric power and an associated measuring device, and has stored a needlessness condition which is configured for every user entity or for every location, and specifies a case where an electric device 2 consumes electric power needlessly. An electric power management device 10 specifies the electric device and measuring device associated with the needlessness condition based on the system information, and from the needlessness condition, configures a determining condition by which it can be determined that the specified electric device uses electric power needlessly, and in the case where the collected electric power information or environment information fulfills the determining condition, determines that needlessness of electric power consumption has arisen.
|