发明名称 HYBRID CONSTRUCTION MACHINE
摘要 <P>PROBLEM TO BE SOLVED: To precisely calculate a present charge rate of a battery. <P>SOLUTION: A hybrid construction machine, during an operation of a generator motor 8a, calculates a present charge rate in an electric current accumulation mode in which a charge current and a discharge current of a battery 12 are accumulated and the accumulation is added to or subtracted from an initial charge rate, and when a cumulative operation time reaches a setting value under the condition that no turning operation is present, switches to a voltage reference mode in which the present charge rate is calculated from a battery voltage on the basis of a predetermined map, and after the calculation of the present charge rate in the voltage reference mode, returns a calculation mode to the electric current accumulation mode and cancels the stop of the generator motor 8. <P>COPYRIGHT: (C)2013,JPO&INPIT
申请公布号 JP2013120174(A) 申请公布日期 2013.06.17
申请号 JP20110269615 申请日期 2011.12.09
申请人 KOBELCO CONTSTRUCTION MACHINERY LTD 发明人 DOI TAKAYUKI;KOMIYAMA MASAYUKI;GOTO NAOKI
分类号 G01R31/36;B60L11/14;E02F9/20;H01M10/48;H02J7/00 主分类号 G01R31/36
代理机构 代理人
主权项
地址